Design & Construction of Salfeet Wastewater Treatment Plant+ 2 years Operation and Maintenance Service and the Optional Item Small Photovoltaic Power Plant.
- 
                            CategorySTEEL STRUCTURE
 - 
                            ClientNablus Municipalty
 - 
                            SupervisorSALFEET MUNICIPALITY
 - 
                            Funded ByKFW
 - 
                            RegionWestbank
 - 
                            From - To2017-07-11 00:00:00 - 2023-03-01 00:00:00
 - 
                            Value7,075,188.00$
 
Design, Construction, Commissioning and two years operation of a wastewater treatment plant. The required hydraulic capacity of the wastewater treatment is to be about 1,900 m3/d (or 20,500 PE).